On rural (resource) access roads in our local it is common to install pipe pile foundations for small simply supported structures (12m-21m) with a dynamic equation such as Engineering News (ENR). We are dealing mainly with cohesive soils and friction piles; the use of dynamic equations has lead to some very conservative designs. I'm advocating the use of a PDA at a minimum, but they can be hard to find in a remote location. Unfortunately re-striking is not a common practice, as the time suggested for set up (3-4 days) does not fit into the construction schedule (5-8 days for structure installation).
Any comments on the use of dynamic equations to predict the capacity of friction piles?
I've noted that the FHWA is advocating a modified Gates and Washington State has adopted their own dynamic equations, what has been the experience to date with these systems?
Any comments on the use of dynamic equations to predict the capacity of friction piles?
I've noted that the FHWA is advocating a modified Gates and Washington State has adopted their own dynamic equations, what has been the experience to date with these systems?