chogben,
It has been a bit since I dropped in to look through some of the queries. Hope this still is timely.
1. What material are you dropping? Ore, aggregate or binder (types, gradation), slurry (percent solids, grind), liquid?
2. What is your drop height and conduit size/shape?
Since you mention pool, I gather you are dealing with slurry and/or liquid. Are you after stilling basin layouts and such or tails drop boxes?
There's a lot of mixed terminology these days, thus my questions.