Hello,
A contractor wants to drill into a new precast box culvert for forming the cast in place headwalls. He would fill them with grout after. Is this generally acceptable practice?
Thanks
A contractor wants to drill into a new precast box culvert for forming the cast in place headwalls. He would fill them with grout after. Is this generally acceptable practice?
Thanks