Well, i am in Australia and doing bored pile estimating and design.
our price here for piles of 18m long, and this quantity, and 8m rock, could be up to 1500 AUD per cu.m or even more.
I am not sure what rock you talk about, for hard rocks it takes ages to drill 8m with normal drilling rig.