what would be the right/cost effective procedure to install drilled concrete piers in backfilled site? (Please see attached)
-backfill with slurry fill and proceed with current design of piers
-or, backfill with cement treated native w/8" lift compaction 95% and modify the tip of the piers to be exteded to the equal depth of the backfill.
-backfill with slurry fill and proceed with current design of piers
-or, backfill with cement treated native w/8" lift compaction 95% and modify the tip of the piers to be exteded to the equal depth of the backfill.