tapirg
Aerospace
- Feb 13, 2008
- 9
Hi All;
I have to drill through a machined aluminium (7075-T7351) alloy ring slot and the carbon ring, which is slotted, into the Ali ring (please see picture attached for more references) and I am not sure which type of drills and “drilling speeds” should I use.
Final hole size is 6.35 mm Ø H7 ant this is achieved by using the following drill sequence: 2.5 mm Ø; 4.5 mm Ø; 6.00 mm Ø and a final reaming @ 6.35 mm Ø
Does this sound reasonable?
As is not only a carbon component, I am not sure if carbide drills are the best option to drill through the whole assembly.
Should I use variable speed as I drill through Ali first then carbon and then Ali again?
Any advice, guidance on this would be really appreciated.
Thank you all in advance
RGT
I have to drill through a machined aluminium (7075-T7351) alloy ring slot and the carbon ring, which is slotted, into the Ali ring (please see picture attached for more references) and I am not sure which type of drills and “drilling speeds” should I use.
Final hole size is 6.35 mm Ø H7 ant this is achieved by using the following drill sequence: 2.5 mm Ø; 4.5 mm Ø; 6.00 mm Ø and a final reaming @ 6.35 mm Ø
Does this sound reasonable?
As is not only a carbon component, I am not sure if carbide drills are the best option to drill through the whole assembly.
Should I use variable speed as I drill through Ali first then carbon and then Ali again?
Any advice, guidance on this would be really appreciated.
Thank you all in advance
RGT