charliealphabravo
Structural
- May 7, 2003
- 796
I am designing the anchor rods for a 20" diameter stack (80' tall). There are two 32" flanges (base plates) with stiffeners. I understand that the stack is designed for complete exposure but in this application only the top 30' will be exposed to wind load.
Does anyone have a reference for how the anchor rod connection is achieved in this case where there are two plates/flanges? I'm not sure yet if I will need to engauge both plates but if I do I'm wondering how the nuts and washers are configured in order to share the load between both base plate flanges. My guess is that in the full exposure case the plates were to accomodate pretensioned rods of some type.
Thanks in advance.
Does anyone have a reference for how the anchor rod connection is achieved in this case where there are two plates/flanges? I'm not sure yet if I will need to engauge both plates but if I do I'm wondering how the nuts and washers are configured in order to share the load between both base plate flanges. My guess is that in the full exposure case the plates were to accomodate pretensioned rods of some type.
Thanks in advance.