Tankmanapi2000
Mechanical
- Feb 4, 2010
- 3
Joe,
I work for Team at a refinery in baytown. We have successfully kept a roof from sinking by using our Closed cell urethane system. As far as I know , we are the only company that has done a double deck cb&i design successfully. The fourth ring flooded and we were able to get the tank back to operation in 10 days.
The tank was never taken out of service.
dennis mccarty
api 2000
nace 111 # 806
Nace CIP instructor
I work for Team at a refinery in baytown. We have successfully kept a roof from sinking by using our Closed cell urethane system. As far as I know , we are the only company that has done a double deck cb&i design successfully. The fourth ring flooded and we were able to get the tank back to operation in 10 days.
The tank was never taken out of service.
dennis mccarty
api 2000
nace 111 # 806
Nace CIP instructor