Tek-Tips is the largest IT community on the Internet today!

Members share and learn making Tek-Tips Forums the best source of peer-reviewed technical information on the Internet!

  • Congratulations TugboatEng on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Discussion and Literature for Driven (Vibrated) Soldier Pile Installation

Status
Not open for further replies.

4vp

Civil/Environmental
Joined
Aug 28, 2014
Messages
3
Location
US
I have a perfect application for Driven (Vibrated) Soldier pile application for 15' deep excavation project. However, the Geotechnical engineer is not familiar with this type of application. My plan is to utilize ABI Mobilram type rig to drive (Vibrate) soldier piles. Please give me your experience and thoughts on how to convince the Geotechnical engineer and the Owner for driven installation method. If you can also give me some literature to support our case that would be helpful. I would like to thank all the contributors in advance and looking forward for good discussion as well..
 
Status
Not open for further replies.

Part and Inventory Search

Sponsor

Back
Top