What is the difference between transfer length and the development length in prestressed concrete?
Silly question yes, but I thought at the end of the transfer length my strands would be developed for my prestress force, 0.7% fpu * lossess. Why then would I need the development length in any of my strength calcs if I'm designing for an effective prestress force?
Danke
Clansman
"If a builder has built a house for a man and has not made his work sound, and the house which he has built has fallen down and so caused the death of the householder, that builder shall be put to death." Code of Hammurabi, c.2040 B.C.
Silly question yes, but I thought at the end of the transfer length my strands would be developed for my prestress force, 0.7% fpu * lossess. Why then would I need the development length in any of my strength calcs if I'm designing for an effective prestress force?
Danke
Clansman
"If a builder has built a house for a man and has not made his work sound, and the house which he has built has fallen down and so caused the death of the householder, that builder shall be put to death." Code of Hammurabi, c.2040 B.C.