Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations IRstuff on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

developing a load schedule

Status
Not open for further replies.

guilio2010

Electrical
Nov 8, 2012
80
I am wanting to calculate power load schedule for a solar power system. I know for DC, there is no reactive power but if I take the DC power through an inverter to 110v, then the inverter to a device that supplies power to a device that is DC, how would I make a load schedule for this? Would I just take the power output of the inverter and match that with the device that has a DC load or take it with the Device power supply that plugs into the inverters AC?
 
Status
Not open for further replies.

Part and Inventory Search

Sponsor