Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

design of Heavy water upgrading plant for nuclear power station

Status
Not open for further replies.

nstress

Mechanical
Aug 6, 2002
13
Hello

We are designing a piping system for the Heavy water Upgrading plant for one of the existing Nuclear Power Plant of 220 Mwe PHWR.

Can any one of you suggest what special precautions apply?


Thanks for sharing your experience.

REGARDS
 
Replies continue below

Recommended for you

nstress

I think you need to talk to your client and ask for the original specs so you can get an idea of what they want. Patricia Lougheed

Please see FAQ731-376 for tips on how to make the best use of Eng-Tips Forums"
 
Status
Not open for further replies.

Part and Inventory Search

Sponsor