Dec 17, 2008 #1 federicop Materials Joined Dec 17, 2008 Messages 1 Location US How relative is the depth of saw cut relative to the concrete thickness and the timing of the sawcut to receive caulk material?
How relative is the depth of saw cut relative to the concrete thickness and the timing of the sawcut to receive caulk material?
Mar 17, 2009 #2 dik Structural Joined Apr 13, 2001 Messages 26,115 Location CA Missed this... but the depth should be 1/4 to 1/3 of the slab thickness and should occur approx 6hrs to 8hrs after finishing. Can be sooner with a sofcut type of saw Dik Upvote 0 Downvote
Missed this... but the depth should be 1/4 to 1/3 of the slab thickness and should occur approx 6hrs to 8hrs after finishing. Can be sooner with a sofcut type of saw Dik