A
anand_m_s
Guest
I have recently switched from Proe 2001 to WF 1.0. In 2001 version there were many options for creating the datum curves which I am finding them absent in WF 1.0. Can anyone guide me to create the datum curves by methods available in 200 version in WF?
Thanks in advance.
Thanks in advance.