I've a feeling this will fall into the "studid" question category but ....
I'm an owner's rep watching a small construction project. Reinforced CMU with concrete tie beams at the top of the walls. Footing and slab-on-grade concrete was tested with 4 X 8 cylinders; fill cell grout with cubes.
The tec made cubes of the pea-rock concrete used for the tie-beams. When I asked the tech about it he said they "always make cubes for pea-rock concrete".
I'm thinking it's concrete so it should have cylinders for testing. When should cylinders be used and when should cubes be used?
Thanks
I'm an owner's rep watching a small construction project. Reinforced CMU with concrete tie beams at the top of the walls. Footing and slab-on-grade concrete was tested with 4 X 8 cylinders; fill cell grout with cubes.
The tec made cubes of the pea-rock concrete used for the tie-beams. When I asked the tech about it he said they "always make cubes for pea-rock concrete".
I'm thinking it's concrete so it should have cylinders for testing. When should cylinders be used and when should cubes be used?
Thanks