SSSHARMA
Petroleum
- Sep 1, 2003
- 12
WE ARE HAVING ONLY ONE TRUNK LINE WHICH IS PRESENTLY USED TO TRANSPORT GAS . IS IT POSSIBLE TO SEND THE WELL FLUID( TWO PHASE ) ALONG WITH THE GAS AS WE WOULD LIKE TO SAVE ADDITIONAL LINE COST. WHAT ARE THE IMPLICATIONS? . IS SUCH A PRACTICE FOLLOWED ANYWHERE ELSE? THE EXISTING CASES MAY BE REFERRED.
SSSHARMA
SSSHARMA