The attached drawing shows an elevation of one area of an existing mezzanine. The column needs to be relocated 30" to towards the 11 ft span. The existing beams (W14x22) are simply supported over each column but have two bolts in each web and a plate between the webs of the beam.
Here's how I'm considering approaching this. Once the column is moved 30", I'll analyze the beams with the 30" cantilever receiving the end reaction from the adjacent 22 ft beam. In reality, the knee brace will tend to pick up most of this reaction but I'll only consider this for the column analysis. I'm trying to be fairly conservative with my approach.
For some reason, this approach is not sitting well with me so I'd like some other opinions. Maybe it's because I'm tired and stretched thin at work, but it has not been my best day.
Here's how I'm considering approaching this. Once the column is moved 30", I'll analyze the beams with the 30" cantilever receiving the end reaction from the adjacent 22 ft beam. In reality, the knee brace will tend to pick up most of this reaction but I'll only consider this for the column analysis. I'm trying to be fairly conservative with my approach.
For some reason, this approach is not sitting well with me so I'd like some other opinions. Maybe it's because I'm tired and stretched thin at work, but it has not been my best day.