wallerdf
Structural
- Aug 4, 2009
- 33
I called for a 3000psi mix. 28 day breaks came in really low. 2150psi average. Had them core and the 3 breaks are as follows: 3750, 2310, 2260psi.
ACI-318 - 5.6.5.4 — Concrete in an area represented by core tests shall be considered structurally adequate if the average of three cores is equal to at least 85 percent of fc and if no single core is less than 75 percent of fc. Additional testing of cores extracted from locations represented by erratic core strength results shall be permitted.
I meet both the 85% and 75% but would anyone consider the 3750 to be erratic? I'm thinking of making them take 3 more cores just to compare.
ACI-318 - 5.6.5.4 — Concrete in an area represented by core tests shall be considered structurally adequate if the average of three cores is equal to at least 85 percent of fc and if no single core is less than 75 percent of fc. Additional testing of cores extracted from locations represented by erratic core strength results shall be permitted.
I meet both the 85% and 75% but would anyone consider the 3750 to be erratic? I'm thinking of making them take 3 more cores just to compare.