Calc1
Structural
- Feb 24, 2005
- 26
I am dealing with a contractor that has placed screw instead of bolt for Simpson connector; he is telling me that it has enough capacity for the applied load.
I am not sure what should I respond to contractor, does he have any leg to stand on? If contractor does not follow the plan, is engineer still liable?
I am not sure what should I respond to contractor, does he have any leg to stand on? If contractor does not follow the plan, is engineer still liable?