ET50
Industrial
- Jan 8, 2010
- 27
A purchase order came through that says "The system will be constructed in accordance with appropriate ASME standards...."
For the purpose of this discussion it is piping per B31.3 and B31.8, however the PO doesn't specifically say that, and the this was intentional by the customer so we wouldn't have to have these pipe spools built in an ASME shop, inspected, etc.
This was not my idea and I don't feel comfortable with it. I feel that this language really does say that we are responsible for making sure these spools are designed, built and inspected per the appropriate codes. I'm the only one that sees it this way. FYI, these are for a central american country, but in my mind it doesn't make any difference where they are installed.
Am I being too cautious? I'm interested in other opinions.
For the purpose of this discussion it is piping per B31.3 and B31.8, however the PO doesn't specifically say that, and the this was intentional by the customer so we wouldn't have to have these pipe spools built in an ASME shop, inspected, etc.
This was not my idea and I don't feel comfortable with it. I feel that this language really does say that we are responsible for making sure these spools are designed, built and inspected per the appropriate codes. I'm the only one that sees it this way. FYI, these are for a central american country, but in my mind it doesn't make any difference where they are installed.
Am I being too cautious? I'm interested in other opinions.