hollowstemhead
Geotechnical
- Feb 26, 2009
- 14
Hello:
I have been playing around with an old fulcrum/lever arm style consolidation frame (Soiltest C-280) with floating ring setup. In discussion with colleagues who have (historically) used the same setup, they mention the use of a 1 inch calibrated steel block placed between the porous stones in the ring, pushing down finger tight to get a base dial reading. They explained this gives an "H sub0" value, basically countering the difference in theoretical height of the specimen in the ring (I guess equal to the height of the calibrated block) and what it actually is. I can't seem to find any mention of this step in the old manuals I pulled from the Soiltest/ELE website or any other procedures I've looked at. Anybody have any experience or resources they could help me out with here? Thanks.
I have been playing around with an old fulcrum/lever arm style consolidation frame (Soiltest C-280) with floating ring setup. In discussion with colleagues who have (historically) used the same setup, they mention the use of a 1 inch calibrated steel block placed between the porous stones in the ring, pushing down finger tight to get a base dial reading. They explained this gives an "H sub0" value, basically countering the difference in theoretical height of the specimen in the ring (I guess equal to the height of the calibrated block) and what it actually is. I can't seem to find any mention of this step in the old manuals I pulled from the Soiltest/ELE website or any other procedures I've looked at. Anybody have any experience or resources they could help me out with here? Thanks.