Engineerd
Civil/Environmental
- Apr 24, 2006
- 30
I am replacing a watermain and I need to connect the new 14" HDPE SDR 11 to the existing 14" SCH 10 Steel pipe going into a pumphouse. Currently the main is connected to the pumphouse piping with a 14" Dresser coupling (outside the pumphouse, below grade). I was thinking either a flanged connection or a coupling of some sort. Any suggestions?