How long should a contractor wait after pouring a drilled pier/pedestal with embedded anchor bolts before placing the steel beam-column on it? The gravity loads are pretty minimal, but the moments under a wind load are pretty high.
Basically, I suspect that my situation is similar to what the billboard erectors would experience. Can anybody shed some light on how long concrete should cure prior to subjecting the foundation to any loads?
Thanks.