I am a structural engineer, so above ground pipe systems are not part of my everday expertise. I am hoping some people here can help me with thier experiences/expertise.
I am planning to use a reinforced concrete saddle (Pipe)support for the piers on my project. I was wondering what others have done between the concrete saddle and steel pipe to allow for movement. The M-11 code simply states "several layers of felt with graphite between" or "joint filler material". I am not particually found of either of these as I see them "walking out" (or falling off) eventually. Any Ideas? What have you called for on your projects? Total movement I'm expecting is about 1.5".
Thanks,
I am planning to use a reinforced concrete saddle (Pipe)support for the piers on my project. I was wondering what others have done between the concrete saddle and steel pipe to allow for movement. The M-11 code simply states "several layers of felt with graphite between" or "joint filler material". I am not particually found of either of these as I see them "walking out" (or falling off) eventually. Any Ideas? What have you called for on your projects? Total movement I'm expecting is about 1.5".
Thanks,