I am designing a concrete balcony supporting by (3) 1" dia threaded rod embedded into the concrete balcony 12"
(see attachment.) The balcony is designed to supported by the rod not by the block veneer below.
I believed the threaded rods had to extended and tied to the blocking in between the TJI in order to resist the uplift forces created by the balcony.
I think shear is not a problem. Just want to see the (3) threaded rod is enough or not.
Please input any suggestion.