When the participating area at the roof to shell junction (without compression ring) is greater than then required participating area as per API 650, does this mean that the roof to shell compression ring may be omitted? (REF API 650 Edition 10, Addendum #4 Section 3.1.5.9 (e) and Section 3.10.5)