Tek-Tips is the largest IT community on the Internet today!

Members share and learn making Tek-Tips Forums the best source of peer-reviewed technical information on the Internet!

  • Congratulations cowski on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Composite Negative Moment

Status
Not open for further replies.

OzEng80

Structural
Joined
Jan 8, 2006
Messages
147
Location
AU
Hi

What is the approach for composite design for a double span steel beam with a concrete slab (precast decking with topping) over? I have found ample references to simply supported beams but nothing for continuous slabs.

My scenario is basically:
A 12m beam supported midspan with a 6m tributary width of a 200 thick slab and 5kPa live load. I am getting a 460UB without any composite action & this seems too big…

Should I treat the beam as fully restrained and ignore composite action (this is how I got the 460UB)?
- What is the minimum number of studs to put in?
- Wouldn’t anything less than providing studs for ‘full’ composite action shear them off?

Should I design the beam using existing methods between the points of contraflexure and use just the steel beam for the negative moment?
- Continuing the stud size & spacing over the internal support would result in tension being applied into the slab. Should I discontinue the studs (& even bondbreak) over the internal support to allow slippage across the interface and prevent tension in the slab? Do I need to check rotation or something?

Should I design the beam using existing methods between the points of contraflexure and use a composite section for the negative moment?
- I could do an equivalent section using the reinforcing in the slab only?

Thanks for your assistance!




 
I dont think you will find anything in the australian codes.

British codes and eurocodes cover it well though.
 
Status
Not open for further replies.

Part and Inventory Search

Sponsor

Back
Top