GoBizon
Structural
- Nov 7, 2006
- 12
I’m looking for feedback on the analysis/common practices for reinforcing an existing W-flange beam. I’ reviewing an existing W-flange beam supporting some mechanical equipment. The owner wants to add equipment to the beam doubling the load on the existing beam and over stressing the beam. I would like to reinforce the beam with a WT section welded to the bottom flange of the existing W-flange beam. The existing load cannot be removed during the installation of the WT. My question is this: Do I treat the design of the built-up section similar to a composite steel/concrete section (simplified: Moment_existing/Section_existing + Moment_additional/Section_built-up)?