Jan 5, 2005 #1 xda Chemical Joined Dec 17, 2004 Messages 14 Location JP where i can find composition (percentage) or component of pipeline construction cost? (for ex. pipe, valve, fitting, labor, paint, corosion protection, instrumentation, etc.) thx for your advice
where i can find composition (percentage) or component of pipeline construction cost? (for ex. pipe, valve, fitting, labor, paint, corosion protection, instrumentation, etc.) thx for your advice
Jan 15, 2005 #2 1969grad Mechanical Joined Apr 5, 2003 Messages 247 Location US Use the Richardson estimating manual which will give you $ cost for installing a valve, bolt-ups, etc. Or check Page's Piping Manhour Manual but you will have to add labor rates which include all direct and indirect costs. All of the above assume that the contractor is already on site. Otherwise, you will have to add the cost of mobilization. Upvote 0 Downvote
Use the Richardson estimating manual which will give you $ cost for installing a valve, bolt-ups, etc. Or check Page's Piping Manhour Manual but you will have to add labor rates which include all direct and indirect costs. All of the above assume that the contractor is already on site. Otherwise, you will have to add the cost of mobilization.