Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Commissioning Plan vs Start-up Plan

Status
Not open for further replies.

CuriousElectron

Electrical
Jun 24, 2017
192
Hi Gents,

What are some differences between a commissioning plan and startup plan for industrial/power plant projects?

Thanks,
EE
 
Replies continue below

Recommended for you

It may be semantics. As an example, the transmission utility I work with refers to my position as Commissioning Engineer. A neighboring utility refers to the same position as Start Up Engineer. In this example the positions are interchangeable.

In industrial / power plant it may also have to do with multiple disciplines as the electrical is only one part of the overall process.
 
Based on the terminology I was taught:

A commissioning plan is an exhaustive / comprehensive plan for completely proving the full functionality of a new build of any kind, including that the correct settings are applied to all alarms, trips, control ranges, et cetera and so forth, performing pre-run end-to-end checks to confirm that all wiring and functionality can be proven while still in the "cold iron" state and in advance of initial first-time-ever actual live plant operation, and also for sequentially testing that, with the plant in actual operation, each and every control / alarm trip point actually controls / alarms / trips for whatever it's supposed to.

A start-up plan is the documentation based upon a known plant configuration and behaviour that incorporates all pertinent limitations on warm-up rates, etc., etc., and is the plan used in start-ups during normal/routine operations once a plant has been fully commissioned.

If "startup plan" is actually meant to mean "initial plant start-up plan", all bets are off...

CR

"As iron sharpens iron, so one person sharpens another." [Proverbs 27:17, NIV]
 
Commissioning and Startup
Knowledge Area Definition
Commissioning and Startup is defined as the transitional phase between plant construction completion and commercial operations. It encompasses all activities that bridge these two phases including systems turnover, checkout of systems, commissioning of systems, the introduction of feedstock, and performance testing.

Source:
<a href=" attendance machine in delhi</a>
 
Status
Not open for further replies.

Part and Inventory Search

Sponsor