Is there any method or material appropriate for restablishing bearing under column baseplates that have a slight gap under them due to either unlevel leving plates or tilted column bases that resulted after leveling up the erected steelwork?
I am referring to tapered gaps in the 1/8" to 1/4" dimension.
An initial search seems to indicate that grouts need to be 1" or greater in thickness.
I am referring to tapered gaps in the 1/8" to 1/4" dimension.
An initial search seems to indicate that grouts need to be 1" or greater in thickness.