Aug 26, 2004 #1 missstructures Structural Joined Apr 12, 2001 Messages 32 Location US How should a diagonal cold joint be repaired in a concrete shear wall? Should it just be re-done (chipped out and re-cast)?
How should a diagonal cold joint be repaired in a concrete shear wall? Should it just be re-done (chipped out and re-cast)?