i had to deal with a similar problem, only difference it was a communication tower for cable&wireless, around 60 meters and it was about 2 meters from the edge.There was a land slide that made that edge a vertical cut.
first , to keep all the underground water away from the cliff, we constructed a underground drainage, with geotextile, crusched rock, and perforated pipes , as close as possible to the edge. Then with the help of a Samsung 280 excavator we constructed a series of benches to distribute the weight, also we constructed some culverts to keep the water from running over the slopes in quantities, also all the surrounding area around the tower was covered with a thing slab of concrete to prevent water to get into any crack of the soil and further water accumulation underground. These measures were taken a year ago, and the land slide and the erotion stopped, so i hope that some of these can help you, i have a problem too, and i posted it so if you can take a look i will appreciate it.