nadd
Structural
- Apr 23, 2002
- 2
Problem: A transmission tower was built near a cliff and this past few months due to heavy rains, parts of the cliff have eroded. So cliff reinforcement in in order. The tower's leg is about 8m from the edge. The cliff is about 19m high with a creek about 3m wide at the bottom. The cliff has a near vertical slope. I am lookng at soil nailing technology to reinforce the cliff. Got any good ideas? Thanks.