StructTaco
Structural
- Jun 19, 2009
- 73
What is the minimum clearance between a structural steel floor beam and the crawl space soil? I can't find anything in the California Building Code (CBC) 2007, based on the IBC 2006 or the ASCE 7-05. I can find weep screed clearance, and wood clearance, but not that required for exposed steel beams.
Thanks for any help,
Taco
Thanks for any help,
Taco