I am working for contract manufacturing site. Some residue limits had been set using batch sizes and lowest unit doses of current and next batches. However, we don't usually know what the next batch will be. What would be a suitable approach to set the limit for active residue? Any inputs would be appreciated.
Also, how is do determine the limit for CIP-100 in this case? What's the current limit for CIP-100 in insdustry?
Thanks
Also, how is do determine the limit for CIP-100 in this case? What's the current limit for CIP-100 in insdustry?