1967pradyot
Geotechnical
- Apr 9, 2003
- 22
An embankment of 3.0m height is to be built on a thick (10m from ground level) marine clay layer whose N=0.It is failing in stability (deep-seated), bearing capacity and naturally the settlement is also abnormally high - so a combination of ground improvements are required.
I am thinking to construct the embankment upto 6.0m i.e preloading with 3.0m surcharge over 3.0m height and wait for 3-4 months and let the embankment fails in shear. After that the entire embankment will be removed and new construction of 3.0m high embankment will be taken up.
Is this a technically correct approach?
I am thinking to construct the embankment upto 6.0m i.e preloading with 3.0m surcharge over 3.0m height and wait for 3-4 months and let the embankment fails in shear. After that the entire embankment will be removed and new construction of 3.0m high embankment will be taken up.
Is this a technically correct approach?