Hi everyone, I would like to use AM modeler in ABAQUS to simulate the process of 3D printing concrete.
I'm building a 10-story model.
When simulating low floors, like the first six floors, it works.
But when I simulate higher floors, I get an error "Time increment required is less than the minimum specified".
So I'm trying to turn down the time increment.
My original minimum increment was 1E-10, then I changed it to 1E-20.
Although it's working, it doesn't seem like we'll see the day when it's finished with the simulation.
I tried to wait for it all night, but when I woke up, it was aborted.
It even crashed the program when I tried to open the monitor.
So I don't think it's realistic to make the time increments that small.
I only create one step and set the time period to 200, it takes 20 seconds to print one layer.
My question is, is it feasible to create such a long time period?
If this is not feasible, how can I simulate such a long printing process?
Thank you for your answers, my English is not very good please forgive me!
I'm building a 10-story model.
When simulating low floors, like the first six floors, it works.
But when I simulate higher floors, I get an error "Time increment required is less than the minimum specified".
So I'm trying to turn down the time increment.
My original minimum increment was 1E-10, then I changed it to 1E-20.
Although it's working, it doesn't seem like we'll see the day when it's finished with the simulation.
I tried to wait for it all night, but when I woke up, it was aborted.
It even crashed the program when I tried to open the monitor.
So I don't think it's realistic to make the time increments that small.
I only create one step and set the time period to 200, it takes 20 seconds to print one layer.
My question is, is it feasible to create such a long time period?
If this is not feasible, how can I simulate such a long printing process?
Thank you for your answers, my English is not very good please forgive me!