WHAT JOIN SYSTEM RECOMMENDED FOR OFFSHORE PLATFORMS(OIL ANS GAS)?
I HAD 2 EXPERINCES WITH ADHESIVE BONDED IN OFFSHORE, ONE THE DESIGN RANGE OF PRESSURE: 225 P/SI, IN THE HYDROTEST PROOF 335PSI, THE ADHESIVE BONDED JOIN CRACK IN 40 MINUTES, AND THE SECOND IN CAMPECHE BAY, A CONLEY PIPE SYSTEM 225 P/SI, THE JOIN (ADHESIVE BONDED) FAILURE TO 250P/SI.
WHO DOES HAVE EXPERIENCE, IN BUTT AND WRAP JOIN SYSTEM?. A ENGINEER, SAID ME THAT THE BUTT AND WRAP IS MORE RELIABLE.
PLEASE I NEED OPINIONS AND EXPERIENCE. THANKS.