kieran1
Structural
- Feb 27, 2002
- 178
I'm working on remedial works to an existing bridge an Africa. It looks like it was constructed in the 1960's. Anyway I don't have any details on the existing design. I tried to analyse the bridge for the existing spans with current truck loading etc and it comes no where near to working although large trucks use it every day.
I have to provide two new carriageways underneath the bridge each at 5.0m wide. See attached existing and proposed.
I measured the beam on site and worked out a rough load based upon a moment capacity for the existing span. My new support arrangement will not result in any larger moments. Based upon this load. My brief is to ensure we don't weaken the existing structure.
I have analysed the new structure as two cantilevers at the ends with the existing splice connections taking no moment. This is under uniform loading. I know non uniform loading will occur. I'm concerned about load transfer across the splice. Anyone got any simple ideas to resolve this. Materails and skilled labour are very rare. I do have some old beams 500mm deep but only 2.0m long. I'm thinking of bolted these to the underside of the existing beams across the splice.
Any recommendations?
Kieran
I have to provide two new carriageways underneath the bridge each at 5.0m wide. See attached existing and proposed.
I measured the beam on site and worked out a rough load based upon a moment capacity for the existing span. My new support arrangement will not result in any larger moments. Based upon this load. My brief is to ensure we don't weaken the existing structure.
I have analysed the new structure as two cantilevers at the ends with the existing splice connections taking no moment. This is under uniform loading. I know non uniform loading will occur. I'm concerned about load transfer across the splice. Anyone got any simple ideas to resolve this. Materails and skilled labour are very rare. I do have some old beams 500mm deep but only 2.0m long. I'm thinking of bolted these to the underside of the existing beams across the splice.
Any recommendations?
Kieran