GemmellG
Materials
- Jun 28, 2012
- 89
Assembling Once Through Steam Generator (OTSG). Work is complete & preparing for the final hydro test. In reviewing the hydro test package & P&ID I noticed the Boiler Feed Water main check valve has a 1” bypass installed I am pretty sure this is not to code can anyone confirm if this is allowed.