poppeye
Mechanical
- Jul 2, 2003
- 63
Any recommendations for a Boiler Feed Recirculation Valve. Will need to Recirculate back to the DA through a 2" pipe. Boiler Max Load 30,000 lbs per hr. Min Load 6000 Lbs per hr. Customer wants to maintain 450psi at boiler inlet control. Drum pressure 340psi. Estimated recirculation would be 44gpm. Customer having problems with spiking feed pressure wants to stabilize.