863bobcat
Mechanical
- Jun 3, 2006
- 2
I am looking for some possible solutions for this project that we have at the beach. Electrical vault for Hotel. Shoring in place, hole is approx 9.4' deep and it needs to be 10.3'deep. Problem we are having is the water does not pump out water fast enough to reach my backhoe down in hole before water and sand keep me a 9.4'.We are not gaining depth no matter what we try. First the shoring was not wide enough so we had to widen it, not easy when it's already down in the sand, Weld some metal pipes together to keep the shoring from caving in, then SCE blue prints were wrong AGAIN; the shoring is not long enough, so the hydrolic pumps in the shoring had to come out, agian not easy when it's already buried. Would of just pulled the shoring out, but two very tall palm trees stopped that. This has been a nightmare job, now can't get it deep enough. TOO MUCH WATER . HOLE MUST BE DRY IN ORDER TO DUMP 3/4" GRAVEL before electrical vault can be placed...Thanks for any feedback...by the I'm the girlfriend looking to come up with the best idea yet.
My boyfriend would think I was the biggest dork for doing this..............so shhhhhhhhhhhhhhh thanks .sorry if I went on and on and I hope it makes scense...
My boyfriend would think I was the biggest dork for doing this..............so shhhhhhhhhhhhhhh thanks .sorry if I went on and on and I hope it makes scense...