Berniedog
Structural
- Dec 19, 2005
- 200
Need help. I designed a retaining wall that will bear on rock. My plans require that the footings be placed at frost depth. The contractor does not want to excavate 3'-6" of rock to make this happen. Could we dowel into the rock to prevent frost heave? Or should I make them remove the rock?