LIGWY
Civil/Environmental
- Nov 11, 2005
- 78
I am working on a project with a foundation that MUST have 4,000psf bearing capacity. The existing soil is only at 1,000 psf. What is the formula to help determine the amount that needs to sub excavated to achieve the required bearing capacity. Everything I have deals with a point load. I also am looking at placing a fabric down to help stabalize the ground prior to placing structural fill.