rwb3rd
Structural
- Jul 26, 2001
- 3
I need a detail for anchoring the top of a w-section against a cmu basement wall that has buldged and cracked. The floor slab has been sealed for radon, so I plan to use epoxy anchors to connect an angle to the floor to hold the bottom of the beam in place. I need details for the top of the beam for floor joist (2x12) parallel and perpendicular to the wall.