structeng13
Civil/Environmental
- Oct 9, 2006
- 16
I am trying to put a panel schedule together, but I have never done it before. It is for a pool building that has some pumps for the pool and spa. I saw an example of another one that shows equivalent load on the A and B phase, my question is whether this is required for 240 Volt application because you are using both phases. For the other lighting loads, only the A or B phase is shown having a wattage. Please help! Thanks!