I must be grasping at straws here. I need to save my client some money by using as much overlay as possible, over a car park. The existing pavement has an area where both concrete and asphalt exists (used to be an underground LPG tank there under a huge concrete slab. They excavated the LPG tank by cutting the concrete and reinstated asphalt pavement.)
My question is, is there a method that allows me to adequately control reflective cracking resulting from overlaying over rigid + flexible pavement.
Cheers.
My question is, is there a method that allows me to adequately control reflective cracking resulting from overlaying over rigid + flexible pavement.