BadgerPE
Structural
- Jan 27, 2010
- 500
Hey all,
I am designing a multitude of open park structures and have came up with a quick question regarding ASCE 7-05 Figure 6-18B. There are two different load cases (A&B) to consider when determining C_NW and C_NL. Do I simply need to check the loading twice to determine my worst load condition? Once using Load Case A coefficients and once using Load Case B coefficients. Any help on this matter would be greatly apprciated.
Thanks!
I am designing a multitude of open park structures and have came up with a quick question regarding ASCE 7-05 Figure 6-18B. There are two different load cases (A&B) to consider when determining C_NW and C_NL. Do I simply need to check the loading twice to determine my worst load condition? Once using Load Case A coefficients and once using Load Case B coefficients. Any help on this matter would be greatly apprciated.
Thanks!