nogienugz
Electrical
- Oct 6, 2007
- 28
Hi,
Anyone here have applied a HRG (high resistance grounding) scheme on a 60kW EDG? Our process engineers are saying that the system that the EDG is supplying should be ON at all time as much as possible but I feel that putting one on that small load is not worth spending a NEMA 3R resistor bank + SE-330 relay + signal wiring , etc. If the load is several hundreds of kVA then I'd most probably be comfortable. Has anyone done this or may came up with a different approach to keep the EDG on even when there is a Ground Fault?
Thanks,
Anyone here have applied a HRG (high resistance grounding) scheme on a 60kW EDG? Our process engineers are saying that the system that the EDG is supplying should be ON at all time as much as possible but I feel that putting one on that small load is not worth spending a NEMA 3R resistor bank + SE-330 relay + signal wiring , etc. If the load is several hundreds of kVA then I'd most probably be comfortable. Has anyone done this or may came up with a different approach to keep the EDG on even when there is a Ground Fault?
Thanks,